The cabinet must support the installation specified by the manufacturer and allow for use and maintenance. The fact that the appliance physically fits does not mean you can remove its cover, conceal connections or reduce clearances.
Confirm the installation type
An integrated machine has provision for a furniture panel and hinges. A freestanding machine can only be installed under a benchtop if the specified conditions are met. Removing a cover requires permission and the specified accessories, where available.
Check the space before moving the machine into position
- Compare dimensions and clearances with the installation plan.
- Check the kickboard, hinges and front panel: they must open without hitting or pressing against the appliance.
- Allow for the specified clearances and ventilation; do not copy the vents used for another model.
- Route cables and hoses so they are not pinched or strained when the installation is closed up.
- Keep access to the tap, power disconnection and service points, as well as a way to remove the machine.
As you push it into place, check that a fitting does not end up against the wall. The detergent drawer and accessible filter need room to operate, which may interfere with a cabinet door.
If it has a drying function
The washer-dryer's thermal system may impose other environmental and maintenance requirements. A closed door or inadequate ventilation may mean the installation does not comply, even if the washing function appears to work.
Cabinet preparation and any new connections must comply with the plan and be handled by an appropriately qualified installer. The siting guide helps you check that there is full access before securing the cabinet in place.
Test the openings and access to service points before permanently closing up the cabinetry.
View all articles in Installing a washing machine: requirements and checks
